Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β
- β
WSDOT announced multiple road closures affecting Puyallup and surrounding areasNo usable supporting receipt β unverified.
- β
The road closures will start on August 3β002: Nightly from 9 p.m. to 5 a.m. the next morning beginning Monday, Aug. 3 to 5 a.m. Friday, Aug. 7, US 2 traffic will alternate with flaggers from Money Creek Campground (milepost 46) to Skykomish east city limits (milepost 49) for utilities work.β
- β
The right lane of northbound SR 522 will closeβ522: From 8 p.m. Wednesday, Aug. 5 to 3 a.m. Thursday, Aug. 6, the right lane of northbound State Route 522 from State Route 202/132nd Avenue to the State Route 9 overpass (milepost 12-13) will close for maintenance.β
- β
The closure of the right lane of northbound SR 522 will be from 8 p.m. Aug. 5β522: From 8 p.m. Wednesday, Aug. 5 to 3 a.m. Thursday, Aug. 6, the right lane of northbound State Route 522 from State Route 202/132nd Avenue to the State Route 9 overpass (milepost 12-13) will close for maintenance.β
- β
The closure of the right lane of northbound SR 522 will end on 3 a.m. Aug. 6β522: From 8 p.m. Wednesday, Aug. 5 to 3 a.m. Thursday, Aug. 6, the right lane of northbound State Route 522 from State Route 202/132nd Avenue to the State Route 9 overpass (milepost 12-13) will close for maintenance.β
- β
The closure of the right lane of northbound SR 522 will be between SR 202 and SR 9No usable supporting receipt β unverified.
- β
I-90 will have two lanes closed both directionsβ090: From 8 p.m. Tuesday, Aug. 4 to 3 a.m. Wednesday, Aug. 5, two lanes of Interstate 90 will close in both directions between Eighth Avenue South (milepost 2) and the floating bridge (milepost 4) for maintenance.β
- β
The closure of I-90 will be from 8 p.m. Aug. 4β090: From 8 p.m. Tuesday, Aug. 4 to 3 a.m. Wednesday, Aug. 5, two lanes of Interstate 90 will close in both directions between Eighth Avenue South (milepost 2) and the floating bridge (milepost 4) for maintenance.β
- β
The closure of I-90 will end on 3 a.m. Aug. 5β090: From 8 p.m. Tuesday, Aug. 4 to 3 a.m. Wednesday, Aug. 5, two lanes of Interstate 90 will close in both directions between Eighth Avenue South (milepost 2) and the floating bridge (milepost 4) for maintenance.
Effective: Jul 30, 2026, 3:43 PM
Expected end: Aug 5, 2026, 3:00 AMβ
- β
The closure of I-90 will be between Eighth Avenue South and the floating bridgeβ090: From 8 p.m. Tuesday, Aug. 4 to 3 a.m. Wednesday, Aug. 5, two lanes of Interstate 90 will close in both directions between Eighth Avenue South (milepost 2) and the floating bridge (milepost 4) for maintenance.β
- β
SR 526 will close its right laneβ526: From 9 p.m. Thursday, Aug. 6 to 5 a.m. Friday, Aug. 7, the right lane of eastbound State Route 526 from Evergreen Way to Casino Road (milepost 3) will close for utilities work.β
- β
The closure of the right lane of SR 526 will be from 9 p.m. Aug. 6β526: From 9 p.m. Thursday, Aug. 6 to 5 a.m. Friday, Aug. 7, the right lane of eastbound State Route 526 from Evergreen Way to Casino Road (milepost 3) will close for utilities work.β
- β
The closure of the right lane of SR 526 will end on 5 a.m. Aug. 7β526: From 9 p.m. Thursday, Aug. 6 to 5 a.m. Friday, Aug. 7, the right lane of eastbound State Route 526 from Evergreen Way to Casino Road (milepost 3) will close for utilities work.
Effective: Jul 30, 2026, 3:29 PM
Expected end: Aug 7, 2026, 5:00 AMβ
- β
The closure of the right lane of SR 526 will be between Evergreen Way and Casino Roadβ526: From 9 p.m. Thursday, Aug. 6 to 5 a.m. Friday, Aug. 7, the right lane of eastbound State Route 526 from Evergreen Way to Casino Road (milepost 3) will close for utilities work.β
- β
I-405 will be fully closed northboundβ405: All lanes of northbound I-405 from North Southport Drive / Northeast Sunset Boulevard to Coal Creek Parkway Southeast will be fully closed day and night, 11:30 p.m. Friday, Aug. 7 β 4 a.m. Monday, Aug. 10. A signed detour will be in place.β
- β
The closure of northbound I-405 will be from 11:30 p.m. Aug. 7No usable supporting receipt β unverified.
- β
The closure of northbound I-405 will end on 4 a.m. Aug. 10No usable supporting receipt β unverified.
- β
A detour will be in place for the closure of northbound I-405β405: All lanes of northbound I-405 from North Southport Drive / Northeast Sunset Boulevard to Coal Creek Parkway Southeast will be fully closed day and night, 11:30 p.m. Friday, Aug. 7 β 4 a.m. Monday, Aug. 10. A signed detour will be in place.β
- β
Southbound I-405 will close overnightβ405: All lanes of southbound I-405 from Southeast Eighth Street to I-90 will be fully closed overnight, 11:30 p.m. Monday, Aug. 3 β 4:30 a.m. Tuesday, Aug. 4. A signed detour will be in place.β
- β
The closure of southbound I-405 will be from 11:30 p.m. Aug. 3β405: All lanes of southbound I-405 from Southeast Eighth Street to I-90 will be fully closed overnight, 11:30 p.m. Monday, Aug. 3 β 4:30 a.m. Tuesday, Aug. 4. A signed detour will be in place.β
- β
The closure of southbound I-405 will end on 4:30 a.m. Aug. 4β022: Both directions milepost 14 to 15 between Granger and Mabton. Monday, Aug. 3 from 7 a.m. to 4:30 p.m. there will be a single-lane closure with flagger-controlled traffic for bridge work.β
- β
Residents should plan for traffic delays during these timesNo usable supporting receipt β unverified.
- β
WSDOT will provide detour routesNo usable supporting receipt β unverified.
- β
WSDOT will provide updates through their websiteNo usable supporting receipt β unverified.
- β
WSDOT will provide updates through their social mediaNo usable supporting receipt β unverified.
- β
The closures are for maintenance and utility workNo usable supporting receipt β unverified.
- β
The closures are to improve road safety and infrastructureNo usable supporting receipt β unverified.