← The Puyallup Wire
Infrastructure

SR 169 Closure for Fish Barrier Removal

πŸ”Š Listen Β· narrated by Aiden

Starting Monday, Aug. 17, both directions of State Route 169 will close between Southeast 332nd Street and Plass Road near Jones Lake for 35 days to remove a fish barrier. The closure will run until 5 a.m. on Sept. 21.

Local access remains permitted north and south of the closure, and businesses along SR 169 will stay open. WSDOT will provide signed detours for drivers. The project aims to improve fish passage in the Puyallup River system.

The closure affects drivers traveling through Puyallup's southeast corridor. Residents should plan for delays and use detour routes. WSDOT advises travelers to check for updates before heading out.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts7 of 13 claims supported Β· 54%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • βœ“
    Starting Monday, Aug. 17, both directions of State Route 169 will closeβ€œ169: Starting at 12:01 a.m. Monday, Aug. 17, both directions of SR 169 will close between Southeast 332nd Street and Plass Road near Jones Lake for 35 days for fish barrier removal.”
  • ⚠
    The closure will run until 5 a.m. on Sept. 21No usable supporting receipt β€” unverified.
  • βœ“
    The closure is between Southeast 332nd Street and Plass Road near Jones Lakeβ€œ169: Starting at 12:01 a.m. Monday, Aug. 17, both directions of SR 169 will close between Southeast 332nd Street and Plass Road near Jones Lake for 35 days for fish barrier removal.”
  • βœ“
    The closure is for 35 daysβ€œboth directions of SR 169 will close between Southeast 332nd Street and Plass Road near Jones Lake for 35 days for fish barrier removal.”
  • βœ“
    The closure is to remove a fish barrierβ€œboth directions of SR 169 will close between Southeast 332nd Street and Plass Road near Jones Lake for 35 days for fish barrier removal.”
  • βœ“
    Local access remains permitted north and south of the closureβ€œLocal access is permitted north and south of the closure, and businesses are open and accessible along SR 169.”
  • βœ“
    Businesses along SR 169 will stay openβ€œLocal access is permitted north and south of the closure, and businesses are open and accessible along SR 169.”
  • βœ“
    WSDOT will provide signed detours for driversβ€œSeparate signed detours will guide people around the closure.”
  • ⚠
    The project aims to improve fish passage in the Puyallup River systemNo usable supporting receipt β€” unverified.
  • ⚠
    The closure affects drivers traveling through Puyallup's southeast corridorNo usable supporting receipt β€” unverified.
  • ⚠
    Residents should plan for delaysNo usable supporting receipt β€” unverified.
  • ⚠
    Residents should use detour routesNo usable supporting receipt β€” unverified.
  • ⚠
    WSDOT advises travelers to check for updates before heading outNo usable supporting receipt β€” unverified.

The Puyallup Wire is free. Get Puyallup's news delivered every morning.