← The Puyallup Wire
Development

Puyallup Car Dealership Stormwater Project Approved

πŸ”Š Listen Β· narrated by Aiden

Puyallup City approved a stormwater facility upgrade at Chevrolet of Puyallup at 800 River Rd. The project will replace an existing biofiltration swale with an underground treatment vault.

The upgrade includes new paving, grading with a retaining wall, an oil/water separator vault, and a new stormwater treatment vault. The project was filed with Pierce County as a SEPA ODNS (No Significant Impact) project.

The project is expected to improve stormwater management at the dealership site. The city's approval does not require public hearings or further review. Residents near the site may see construction activity in the coming months.

πŸ“„ Source: WA Ecology SEPA β€” Pierce County β€” https://data.wa.gov/resource/mmcb-z6jf.json?countyname=PIERCE
Source receipts3 of 10 claims supported Β· 30%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • ⚠
    Puyallup City approved a stormwater facility upgrade at Chevrolet of PuyallupNo usable supporting receipt β€” unverified.
  • βœ“
    The project will replace an existing biofiltration swale with an underground treatment vaultβ€œChevrolet of Puyallup – Stormwater facility upgrade project. The project would replace the existing biofiltration swale on-site with an underground treatment vault.”
  • ⚠
    The upgrade includes new pavingNo usable supporting receipt β€” unverified.
  • ⚠
    The upgrade includes grading with a retaining wallNo usable supporting receipt β€” unverified.
  • βœ“
    The upgrade includes an oil/water separator vaultβ€œThe project would replace the existing biofiltration swale on-site with an underground treatment vault. Anticipated improvements include new paving, on site grading with retaining wall, oil/water separator vault and new stormwater treatment vault.”
  • βœ“
    The upgrade includes a new stormwater treatment vaultβ€œThe project would replace the existing biofiltration swale on-site with an underground treatment vault.”
  • ⚠
    The project was filed with Pierce County as a SEPA ODNS (No Significant Impact) projectNo usable supporting receipt β€” unverified.
  • ⚠
    The project is expected to improve stormwater management at the dealership siteNo usable supporting receipt β€” unverified.
  • ⚠
    The city's approval does not require public hearings or further reviewNo usable supporting receipt β€” unverified.
  • ⚠
    Residents near the site may see construction activity in the coming monthsNo usable supporting receipt β€” unverified.

The Puyallup Wire is free. Get Puyallup's news delivered every morning.