← The Puyallup Wire
Development

Puyallup Announces Final Bids for Infrastructure Projects

πŸ”Š Listen Β· narrated by Aiden

Puyallup has finalized bids for several infrastructure projects including road resurfacing, sewer replacements, and park upgrades. The city awarded contracts for chip seal work on streets (Bid No. PK-002), sewer main replacement on 3rd Street SE (Bid No. 21-010), and storm upgrades on 4th Avenue NW (Bid No. 23-008). Projects include emergency sewer repairs on 4th Avenue SE (Bid No. 25-018) and playground equipment at Clarks Creek Park (Bid No. 23-005P). The city will proceed with these projects after finalizing contracts. Additional bids for 31st Avenue SE overlay (Bid No. STS03-026) and 7th Avenue SW sidewalk improvements (Bid No. 23-012) are still pending.

πŸ“„ Source: Bids & Contracts β€” https://www.cityofpuyallup.org/Bids.aspx
Source receipts7 of 19 claims supported Β· 37%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • ⚠
    Puyallup has finalized bids for several infrastructure projectsNo usable supporting receipt β€” unverified.
  • ⚠
    The infrastructure projects include road resurfacingNo usable supporting receipt β€” unverified.
  • ⚠
    The infrastructure projects include sewer replacementsNo usable supporting receipt β€” unverified.
  • ⚠
    The infrastructure projects include park upgradesNo usable supporting receipt β€” unverified.
  • ⚠
    The city awarded contracts for chip seal work on streetsNo usable supporting receipt β€” unverified.
  • βœ“
    The chip seal work on streets has Bid No. PK-002β€œBid No. PK-002 Final Bid Results Status: Closes: Open Upon Contract Final Bid Results - 2026 Chip Seal”
  • ⚠
    The city awarded contracts for sewer main replacement on 3rd Street SENo usable supporting receipt β€” unverified.
  • βœ“
    The sewer main replacement on 3rd Street SE has Bid No. 21-010β€œBid No. 21-010 FINAL BID RESULTS Status: Closes: Open Upon Contract Final Bid Results - 3rd St SE; 7th to 9th Sewer Main Replacement”
  • ⚠
    The city awarded contracts for storm upgrades on 4th Avenue NWNo usable supporting receipt β€” unverified.
  • βœ“
    The storm upgrades on 4th Avenue NW has Bid No. 23-008β€œBid No. 23-008 23-008 Final Bid Tab Status: Closes: Open Upon Contract Final Bid Results - 4th Ave NW Storm Upgrades”
  • ⚠
    The projects include emergency sewer repairs on 4th Avenue SENo usable supporting receipt β€” unverified.
  • βœ“
    The emergency sewer repairs on 4th Avenue SE has Bid No. 25-018β€œBid No. 25-018 Final Bid Results Status: Closes: Open Upon Contract Final Bid Results - 4th Ave SE Emergency Sewer Repair Project”
  • ⚠
    The projects include playground equipment at Clarks Creek ParkNo usable supporting receipt β€” unverified.
  • βœ“
    The playground equipment at Clarks Creek Park has Bid No. 23-005Pβ€œBid No. 23-005P Final Bid Tab Results Status: Closes: Open Upon Contract Final Bid Results - Clarks Creek Playground Equipment Bid No. 23-005P Final Bid Tab Results Status: Closes: Open Upon Contract”
  • ⚠
    The city will proceed with these projects after finalizing contractsNo usable supporting receipt β€” unverified.
  • ⚠
    Additional bids for 31st Avenue SE overlay are still pendingNo usable supporting receipt β€” unverified.
  • βœ“
    The 31st Avenue SE overlay has Bid No. STS03-026β€œ31st Ave SE Overlay Bid No. STS03-026 Final Bid Results Status: Closes: Open Upon Contract”
  • ⚠
    Additional bids for 7th Avenue SW sidewalk improvements are still pendingNo usable supporting receipt β€” unverified.
  • βœ“
    The 7th Avenue SW sidewalk improvements have Bid No. 23-012β€œPreliminary Bid Results-7th Ave SW Sidewalks and Crossing Bid No. 23-012 Preliminary Bid Results Status: Closes: Open Upon Contract”

The Puyallup Wire is free. Get Puyallup's news delivered every morning.