Pierce County has issued environmental reviews for two residential projects in the Puyallup area and a solar energy code update. The Himenes project involves correcting a site development violation on a 12.27-acre parcel, with 71,500 square feet of fill and grade work. The Clover Springs PDD project proposes 72 single-family lots on 14.25 acres in the Puyallup area, with a density of 6 units per acre. The solar code update would require project-specific permits for solar and battery storage systems. Public comments on the Himenes and Clover Springs projects are due by September 3, 2026. The solar code update comments are due September 1. Pierce County Planning and Public Works will consider the solar code amendments at a council meeting.
Pierce County Approves New Residential Projects
π Listen Β· narrated by Aiden
π Source: WA Ecology SEPA β Pierce County β https://data.wa.gov/resource/mmcb-z6jf.json?countyname=PIERCE
Source receipts5 of 10 claims supported Β· 50%
Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β
- β Pierce County has issued environmental reviews for two residential projects in the Puyallup areaNo usable supporting receipt β unverified.
- β Pierce County has issued environmental reviews for a solar energy code updateNo usable supporting receipt β unverified.
- βThe Himenes project involves correcting a site development violation on a 12.27-acre parcelβDescription: The environmental application was required for a site development violation (Case 83912) in which approximately 71,500 square feet of fill and grade was done on a 12.27-acre residential parcel.β
- βThe Himenes project involves 71,500 square feet of fill and grade workβDescription: The environmental application was required for a site development violation (Case 83912) in which approximately 71,500 square feet of fill and grade was done on a 12.27-acre residential parcel.β
- βThe Clover Springs PDD project proposes 72 single-family lots on 14.25 acres in the Puyallup areaβPreliminary plat to subdivide 14.25 acres (12.04 net developable acres) into 72 single-family residential lots and dedicate 57,266 square feet to recreational space. The PDD proposes a minimum lot width of 40-feet and minimum lot size of 3,806 square feet. The MSF zone requires a density of 4 to 6 dwelling units per acre (du/ac). The proposed density is 6 du/ac.β
- βThe Clover Springs PDD project has a density of 6 units per acreβThe MSF zone requires a density of 4 to 6 dwelling units per acre (du/ac). The proposed density is 6 du/ac.β
- β The solar code update would require project-specific permits for solar and battery storage systemsNo usable supporting receipt β unverified.
- βPublic comments on the Himenes and Clover Springs projects are due by September 3, 2026βComments due: 2026-09-03β
- β The solar code update comments are due September 1No usable supporting receipt β unverified.
- β Pierce County Planning and Public Works will consider the solar code amendments at a council meetingNo usable supporting receipt β unverified.
The Puyallup Wire is free. Get Puyallup's news delivered every morning.