← The Puyallup Wire
Development

New Parking Lot Planned for Inter Avenue in Puyallup

πŸ”Š Listen Β· narrated by Aiden

The City of Puyallup issued an environmental determination on April 15, 2026, for a new off-street parking lot at 2401 Inter Ave. The project, applied for by Jason Sea, would add 62 parking stalls plus semitruck parking to the site. No new buildings are proposed.

According to the SEPA filing, approximately half of the stalls will serve Red Dot Corporation, a business located directly north of the project site. The development includes paving, striping, landscaping, lighting, and stormwater infrastructure.

The City issued an Optional DNS-M determination, meaning the project passed an initial environmental review with mitigating conditions. The filing is listed under civil application PRCCP20250176.

πŸ“„ Source: WA Ecology SEPA β€” Pierce County β€” https://data.wa.gov/resource/mmcb-z6jf.json?countyname=PIERCE
Source receipts1 of 15 claims supported Β· 7%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • ⚠
    The City of Puyallup issued an environmental determination on April 15, 2026No usable supporting receipt β€” unverified.
  • ⚠
    The environmental determination was for a new off-street parking lot at 2401 Inter AveNo usable supporting receipt β€” unverified.
  • ⚠
    The project was applied for by Jason SeaNo usable supporting receipt β€” unverified.
  • ⚠
    The project would add 62 parking stalls plus semitruck parking to the siteNo usable supporting receipt β€” unverified.
  • ⚠
    No new buildings are proposedNo usable supporting receipt β€” unverified.
  • ⚠
    According to the SEPA filing, approximately half of the stalls will serve Red Dot CorporationNo usable supporting receipt β€” unverified.
  • ⚠
    Red Dot Corporation is a business located directly north of the project siteNo usable supporting receipt β€” unverified.
  • ⚠
    The development includes pavingNo usable supporting receipt β€” unverified.
  • ⚠
    The development includes stripingNo usable supporting receipt β€” unverified.
  • ⚠
    The development includes landscapingNo usable supporting receipt β€” unverified.
  • ⚠
    The development includes lightingNo usable supporting receipt β€” unverified.
  • βœ“
    The development includes stormwater infrastructureβ€œThe project also includes utility extensions with a sewer pump-out station, removal of the existing Jerkovich Pier and creosote piles, and shoreline mitigation improvements such as beach nourishment and stormwater outfall restoration.”
  • ⚠
    The City issued an Optional DNS-M determinationNo usable supporting receipt β€” unverified.
  • ⚠
    The project passed an initial environmental review with mitigating conditionsNo usable supporting receipt β€” unverified.
  • ⚠
    The filing is listed under civil application PRCCP20250176No usable supporting receipt β€” unverified.

The Puyallup Wire is free. Get Puyallup's news delivered every morning.