Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β
- β
WSDOT announced overnight closures on I-405, I-90, and SR 527β405: Up to two lanes of southbound I-405 from milepost 12 to Coal Creek Parkway Southeast (milepost 10) will be closed overnight, 9 p.m. Thursday, Sept. 3 β 5 a.m. Friday, Sept. 4.
090: The eastbound I-90 off-ramp to Factoria Boulevard will be closed nightly, 9 p.m. Monday, Aug. 31 β 5 a.m. Friday, Sept. 4. A signed detour will be in place.
527: The right lane of northbound SR 527 at the I-405 ramps (milepost 2.6 to milepost 2.95) will be closed overnight from 11:59 p.m. Monday, Aug. 31 to 5 a.m. Tuesday, Sept. 1.β
- β
The overnight closures on I-405, I-90, and SR 527 will start on Thursday, Sept. 3No usable supporting receipt β unverified.
- β
The overnight closures on I-405, I-90, and SR 527 will end on Friday, Sept. 4No usable supporting receipt β unverified.
- β
The I-405 southbound lane closure will affect traffic near Coal Creek Parkway Southeastβ405: Up to two lanes of southbound I-405 from milepost 12 to Coal Creek Parkway Southeast (milepost 10) will be closed overnight, 9 p.m. Thursday, Sept. 3 β 5 a.m. Friday, Sept. 4.β
- β
The I-90 eastbound off-ramp to Factoria Boulevard will be closed nightly until Sept. 4β090: The eastbound I-90 off-ramp to Factoria Boulevard will be closed nightly, 9 p.m. Monday, Aug. 31 β 5 a.m. Friday, Sept. 4. A signed detour will be in place.β
- β
The I-405 northbound lane work will continue nightly from Aug. 31No usable supporting receipt β unverified.
- β
The I-405 northbound lane work will continue nightly through Sept. 4No usable supporting receipt β unverified.
- β
SR 527 will close one lane overnight on Aug. 31β527: The right lane of northbound SR 527 at the I-405 ramps (milepost 2.6 to milepost 2.95) will be closed overnight from 11:59 p.m. Monday, Aug. 31 to 5 a.m. Tuesday, Sept. 1.β
- β
SR 527 will close one lane overnight through Sept. 1β527: The right lane of northbound SR 527 at the I-405 ramps (milepost 2.6 to milepost 2.95) will be closed overnight from 11:59 p.m. Monday, Aug. 31 to 5 a.m. Tuesday, Sept. 1.β
- β
Residents should expect delays during these timesNo usable supporting receipt β unverified.
- β
Residents should follow detour signsNo usable supporting receipt β unverified.
- β
WSDOT advises drivers to plan ahead for travel through the work zonesNo usable supporting receipt β unverified.
- β
The I-5 fish passage project near exit 240 will continue nightly until Sept. 10β005: The northbound and southbound I-5 will be reduced to a single lane from 8 p.m. to 5 a.m. nightly Monday, Aug. 31, through Friday morning, Sept. 4, near Alger/Lake Samish Road (exit 240) for fish passage construction.
More information on the <a href="https://wsdot.wa.gov/construction-planning/search-projects/i-5-tributaries-friday-lake-chuckanut-creeks-fish-passage">project webpage</a>.
Effective: Aug 14, 2026, 12:55 PM
Expected end: Sep 10, 2026, 5:00 AMβ
- β
The I-5 fish passage project near exit 240 will reduce lanes from 8 p.m. to 5 a.m.β005: The northbound and southbound I-5 will be reduced to a single lane from 8 p.m. to 5 a.m. nightly Monday, Aug. 31, through Friday morning, Sept. 4, near Alger/Lake Samish Road (exit 240) for fish passage construction.β
- β
SR 4 will have single-lane closures weekdays until Sept. 11β004: Monday, Aug. 17 through Friday, Sept. 11: A single lane in both directions of SR 4 between 50th Avenue (milepost 56.4) and 42nd Avenue (milepost 57.2) will be closed weekdays from 7:30 a.m. to 5 p.m., for buried gas main line extension work.β
- β
SR 4 will have single-lane closures for gas line workβ004: Monday, Aug. 17 through Friday, Sept. 11: A single lane in both directions of SR 4 between 50th Avenue (milepost 56.4) and 42nd Avenue (milepost 57.2) will be closed weekdays from 7:30 a.m. to 5 p.m., for buried gas main line extension work.β